Acton Park Estate, London

Project Info

  • Project Value

    £163,000

  • Category

    Surfacing

Job Title

Acton Park Estate, The Vale W3 London

Client

SEGRO

Description

As part of a scheme to improve safety on a busy west London trading estate, we were contracted by SEGRO to undertake resurfacing works in the main entrance to the estate.

The specification called for planning out the existing failing surface course and replacing with a reinforced heavy duty macadam stone mastic surface course. In order to avoid disruption to the businesses on the estate the work was carried out at night. Closing the main gate, we used a 2m tracked planer to remove the old surface directly into tippers lorries, we spray applied tack coat emulsion along with fixing the reinforcing mesh to the planned surface before machine laying 120t of heavy duty SMA surface course. Work was completed in the early hours ready for the first vehicles the next day. The following evening line markings, zebra crossings and speed humps were fixed.

Construction Date

2018