Gossops Green School, Crawley

Project Info

  • Project Value

    £30,000

  • Category

    Schools

Job Title

Gossops Green School – Decking and Pond Dipping Project

Client

Gossops Green School – Crawley

Description

Construction of a new path and board walk to a decking area along with a pond and nature area for the school. Ground clearance and excavation for the new pond was carried out using cut and fill to reprofile the ground levels. A new pond was constructed and lined with the edges formed in natural stone boulders and planted.

New tarmac paths were constructed and we erected log retaining walling. The area was then enclosed with timber palisade fencing and gates.

Access to the dipping area was formed in decking planks fitted to posts and bearers. The decking and substructure designed and built on site using treated timber and recycled plastic.
Work was undertaken during school holidays and completed in term time.

Duration

6 Weeks